The April 16-17 work session was a great one: The gear shaft for the #3 truck was assembled after some parts and tooling was constructed; flanging the bottom end of the first sand box commenced, again after making some tooling; The holes for the oil lines to the three new center plates were finish drilled, and the oil lines cut, threaded, and installed; And last but not the least, machining on the #2 truck gear shaft began.
Note: there are two pages of thumbnails for this album.