A tremendous work session attended by 14 people from Ohio, Virginia, West virginia, North Carolina and Ohio. Several milestones were reached: The corner joint connecting the water tank sides to the bottom plate was totally welded; The sand boxes for the back of the tender tank were structurally completed; The truck shaft (so called by Climax) and truck bolster were installed into the tender truck. A very productive weekend!