49/53 | E-Y-3 Return to MSR&LHA Home page |
Drilling of 1 3/16 holes in ends of new arch bars for Climax truck side frame. Arch bar is being held in a shaper vise, bolted to the block on the radial drilling machine. Free end of arch is resting on roller stand. By moving the drilling head and arm, both holes can be drilled without disturbing the work piece.
Photo by Bill Liebman |